Week 1 – Pulling up the floor

Our first week digging into the conversion started with pulling out the last two benches and then pulling up the floor: We used drills to remove the heater hose covers and the floor trim pieces. Once all the nails were out we pulled up all the looser spots of rubber by hand. Some of it... Continue Reading →

Powered by WordPress.com.

Up ↑